I made the second loom last evening and it's just as solid as the first, then I fitted them to the new fuse box, perfect. The next job is to mount the fuse box and drill the holes to take the wiring through and re build the switch to fuse loom. This, unfortunately must be done in situ if I want to keep the whole thing inconspicuous. As this is a non Samuel weekend coming up, I will try to get as much done as I can, The main need is for the various holes that need to be drilled. There are a lot.
- For fuse box
- For curtain rail
- For licence plates
- For Fridge mounting
All fairly straightforward but a lot of them.
No comments:
Post a Comment